WE Report

Lessons Learned

Lesson Learned





By: Drilling Engineer

Report No.

5861

Discipline/Origin

Drilling
Own Experience

Well

Norma
25/7-11 S

Date created

2023/07/30
861 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Operational
Negative

Deepsea Yantai


What happened in Top hole:
Difficult to see cement in return due to poor visibility at seabed. pH sniffer indicated cement in return, but fault in reading on the conductor cement job. Indication of top of cement at seabed of the pressure build up when displacing the pipe with DW.

What Was Planned

To indicate cement in returns with ROV and with pH meter.

What Was Learned

Best indication of top of cement is the pressure build up when displacing. Difficult to see returns at seabed due to poor vision on seabed.